久久婷婷六月,妺妺窝人体色www在线直播,高清久久精品亚洲日韩Av,99精品免费视频,无人视频在线观看免费播放影院,亚洲尤物av一区,国产成人精品亚洲午夜,国产成人亚洲欧美日韩

      佛山市宏宸陶瓷有限公司

        Foshan Hongchen Ceramics Co. LTD

      National Service Hotline:

      0757-82723870  

      Make bricks with care and focus on engineering tiles

      With craftsmanship, remain craftsmen, craftsmen
      FAQ
      What preliminary work do we usually need to do before laying bricks?
      2019/5/1 0:00:00

      In daily life, if we want ceramic tiles to last for a long time, not only do we need to maintain them after laying them, but also the preparation work before laying them is extremely important. Some ceramic tiles laid on household walls will fall off to some extent after 5-6 years of decoration and use. This is because the preparation work before laying them is not done enough, which causes this phenomenon to occur. Here, we teach you the methods to prevent falling off when laying tiles.


      1、 Ceramic tiles should fully absorb water


      Floor tiles or ceramic tiles are all materials that need to be soaked in water. It is necessary to ensure that they soak in water for sufficient time to keep the moisture of the tiles in a saturated state. This way, the tiles will not absorb water from the cement due to insufficient moisture and excessive dryness during laying. If this situation occurs, it will cause poor bonding between the tiles and the cement, and even hollowing or even falling off;


      2、 Before laying, thoroughly clean the wall surface


      If there are cracks or uneven areas on the wall, it is necessary to first fill them with sealant to maintain the flatness of the wall. If there are objects such as lime paste, they should also be cleaned before laying. A flat and clean wall is more conducive to the bonding between tiles and the wall;


      3、 The wall should be soaked and moist


      Not only do tiles need to be soaked in water to keep them moist, but before tiling, the walls should also be fully watered to maintain a moist state. This way, the moisture in the mortar will not be absorbed by the dry wall and affect the bonding degree. Otherwise, the effect of cement adhesive will not be obvious, which will affect the bonding degree and cause potential risks of tile detachment in the future.


      暫無(wú)內(nèi)容

      Contact hotline

      tel:18064692610

      wc:18064692610

      Email:2161499560@qq.com



      佛山市宏宸陶瓷有限公司

      Foshan Hongchen Ceramics Co. LTD

      What preliminary work do we usually need to do before laying bricks?

      In daily life, if we want ceramic tiles to last for a long time, not only do we need to maintain them after laying them, but also the preparation work before laying them is extremely important. Some ceramic tiles laid on household walls will fall off to some extent after 5-6 years of decoration and use. This is because the preparation work before laying them is not done enough, which causes this phenomenon to occur. Here, we teach you the methods to prevent falling off when laying tiles.


      1、 Ceramic tiles should fully absorb water


      Floor tiles or ceramic tiles are all materials that need to be soaked in water. It is necessary to ensure that they soak in water for sufficient time to keep the moisture of the tiles in a saturated state. This way, the tiles will not absorb water from the cement due to insufficient moisture and excessive dryness during laying. If this situation occurs, it will cause poor bonding between the tiles and the cement, and even hollowing or even falling off;


      2、 Before laying, thoroughly clean the wall surface


      If there are cracks or uneven areas on the wall, it is necessary to first fill them with sealant to maintain the flatness of the wall. If there are objects such as lime paste, they should also be cleaned before laying. A flat and clean wall is more conducive to the bonding between tiles and the wall;


      3、 The wall should be soaked and moist


      Not only do tiles need to be soaked in water to keep them moist, but before tiling, the walls should also be fully watered to maintain a moist state. This way, the moisture in the mortar will not be absorbed by the dry wall and affect the bonding degree. Otherwise, the effect of cement adhesive will not be obvious, which will affect the bonding degree and cause potential risks of tile detachment in the future.


         
       
      X
       
         
      主站蜘蛛池模板: 津市市| 临洮县| 成人影院激情av在线| 呼和浩特市| 最新午夜国内自拍视频| 亚洲福利第一页在线观看| 美女熟妇67194免费入口| 长葛市| 亚洲青涩在线不卡av| 精品亚洲一区二区三区| 在线播放中文字幕一区二区三区 | 和硕县| 久久久亚洲日本精品一区| 久久无码中文字幕东京热| 海门市| 凤山市| 日产精品一区二区三区| 亚洲av成人一区二区三区网址| 精品久久日产国产一区| 国产日韩欧美视频成人| 日本经典中文字幕人妻| 亚欧乱色束缚一区二区三区| 特黄三级一区二区三区| 日韩精品一区二区三区中文| 国产免费一区二区视频| 精品视频在线观看二区| 最新手机国产在线小视频| 久久狠狠爱亚洲综合影院| 久久99中文字幕久久| 色窝窝手在线视频| 中文字幕一二区中文字幕| 自慰高潮网站在线观看| 国产激情视频在线观看你懂的| 蜜臀av国内精品久久久较| 日本中文字幕一区二区视频| 宅宅午夜无码一区二区三区| 日本韩国一区二区精品| 亚洲大片免费播放地址| 亚洲精品99久久久久久| 玖玖玖亚洲一区二区三区| 亚洲国产日韩综一区二区在性色|